AFRICAN REINSURANCE CORPORATION- REQUEST FOR PROPOSAL FOR THE SUPPLY AND INSTALLATION OF 30KVA UPS AT 19/20 AKARIGBERE CLOSE, VICTORIA, ISLAND, LAGOS LAGOS, NIGERIA

AFRICAN REINSURANCE CORPORATION
RFP – SUPPLY AND INSTALLATION OF 30KVA UPS AT 19/20 AKARIGBERE CLOSE, VICTORIA, ISLAND, LAGOS
LAGOS, NIGERIA
CLOSING DATE FOR APPLICATIONS: 2026-02-13

PROJECT OBJECTIVES
The objective of this project is to supply, install, test, and commission a 30kVA Uninterruptible Power Supply (UPS) to provide a reliable and uninterrupted backup power solution for the lift system at the residence. The UPS shall ensure continuous and safe lift operation during power o...

You need to login to view the rest of the content. Please . Not a Member? Register