AFRICAN REINSURANCE CORPORATION
RFP – SUPPLY AND INSTALLATION OF 30KVA UPS AT 19/20 AKARIGBERE CLOSE, VICTORIA, ISLAND, LAGOS
LAGOS, NIGERIA
CLOSING DATE FOR APPLICATIONS: 2026-02-13
PROJECT OBJECTIVES
The objective of this project is to supply, install, test, and commission a 30kVA Uninterruptible Power Supply (UPS) to provide a reliable and uninterrupted backup power solution for the lift system at the residence. The UPS shall ensure continuous and safe lift operation during power o...