TOTAL ENERGIES EP NIGERIA LIMITED
OPERATOR OF THE NNPC/TOTAL ENERGIES JOINT VENTURE
TENDER OPPORTUNITY: LONG LEAD ITEMS (LLI) PROCUREMENT SERVICES FOR THE UBETA MAIN DEVELOPMENT PROJECT FOR TOTALENERGIES EP NIGERIA LIMITED
NIPEX TENDER REF: TEPNG.00000247, TEPNG.00000248, TEPNG.00000249, TEPNG.00000250, TEPNG.00000251, TEPNG. 00000252
1. INTRODUCTION
TotalEnergies EP Nigeria Limited (TotalEnergies) operator of the NNPC/TotalEnergies Joint Venture invites Interested and pre-qualified Contractors ...